- Battery
- 53 kWh
- Efficiency
- 15.5kWh/100
- DC peak
- 150 kW
- 150 kW fast charge
- Under $40,000 after rebate

Rebates by province, EVAP-eligible cars and trucks, home and public charging, insurance, winter range and 10-year ownership costs, all in one place. Every figure is dated and linked to its source, and our own estimates are labelled.
Or start with a question
10-year total cost of ownership · purchase + energy + maintenance + insurance, before sales tax
The Mach-E costs $3,560 more upfront after the rebate, then runs about $1,596/yr cheaper. Break-even is when its running total drops below the RAV4's.
Ontario electricity rates valid until Oct 31, 2026 (OEB prices effective Nov 1, 2025). New OEB prices start Nov 1, 2026: Ultra-Low Overnight 3.7¢, Time-of-Use off-peak 9.1¢.
Built for every Canadian EV driver
Buyers, used-EV shoppers, owners, condo dwellers and truck shoppers all need different answers. Pick your path.
Real price after rebates, winter range, and what it costs over 10 years.
Battery health, recalls, charging tests and whether a rebate applies.
Maintenance that still matters, charging habits and winter driving.
Charging without a driveway: board approval, Level 1 math and public DC.
Electric pickups against gas trucks: price after rebate, towing range and cold-weather losses.
EVAP-eligible picks
21 trims currently qualify for the federal rebate. These three stand out for price, range and charging speed.
Everything in one place
No account needed. Sourced figures link to their source and date; our own estimates are labelled as estimates.
Where charging actually happens
Energy cost per 100 km for the same vehicle, changing only where you plug in. Home overnight charging is what makes an EV cheap - public fast charging narrows the gap fast.
Off-peak charging
Ontario's Ultra-Low Overnight rate is 3.9¢/kWh between 11pm and 7am - about a tenth of the on-peak rate. Here's what that window actually buys you. Full ULO overnight math.
A Level 2 install in Ontario runs $1,000–$3,500 for most homes, and legally requires an ESA permit plus a Licensed Electrical Contractor.
What owners actually run into
Each card links to its own sources and says plainly when it is owner-forum colour rather than a measured result. Each one includes what you can do about it.
Road trips mean juggling network apps, carrying adapters, and often not knowing the price until you plug in. Reliability is improving but not solved: in the US, J.D. Power's 2026 study found 12% of public-charger visits ended with no charge (down from 20% in Q4 2024), and Consumer Reports' 2025 survey found a problem in about 1 of every 5 sessions. We have not found an equivalent Canadian measurement.
Set up accounts before you travel, keep a NACS/CCS adapter in the car, and plan routes around networks that support tap-to-pay.
Sources are linked inside each card. Charging-reliability figures are US data - we have not found a Canadian equivalent yet.
Straight answers
The old iZEV program has ended. It was replaced by the Electric Vehicle Affordability Program (EVAP), live since February 2026, offering up to $5,000 for battery-electric and hydrogen vehicles and $2,500 for plug-in hybrids. Two conditions must BOTH be met: the final transaction value must be $50,000 or less (no cap for Canadian-built EVs), and the vehicle must be manufactured in Canada or a country with an active free trade agreement. See which catalogue models currently qualify.
Want the underlying numbers? Browse the Statistics Hub